lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

What is the equation of the following graph?
The 1928 film in old arizona features the song "my antonia." what current trend did this song capitalize on?
Simplify 8 – 4x – 5 + x. 1 x – 2 2 – 2x 3 – 3x
A lot of companies have unnecessary rules just because they want to control people
Anyone please help I don’t understand this!
hi guys can you give me some tips to be a good writer?
when an arthor focuses on characterization in a piece of fiction, it means that he or she provides details about the
A regular hexagon is inscribed inside a circle. The perimeter of the hexagon is 90 units. What is the approximate measure of the radius of the circle?
Really need help with number nine thank you :))
Please help ASAP! Describe at least one way in which each of Earth’s subsystems was altered during the Precambrian era.