matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

what is your insight in physical activity during the new normal?
What does less than the quantity mean
Solve 5x^2+2x=1 using either factoring, square root method, completing the square or quadratic formula.
Lines l and m are parallel. Which angle is a corresponding angle with ∠5? ∠7 ∠6 ∠8
20x = 19 – (3 + 12x)
a loan of $1,050 was repaid at the end of 18 months with a check for $1,075. what annual rate of interest was charged?
a number subtracted from 18 is equal to the quotient of 180 and -9.
Natalie drinks 2 pints of milk each day. How many days does it take her to drink 1 gallon of milk?
Compare the two elements H and Na
Brown v. Board of Education provided protections under which amendment that permitted state-imposed separation of citizens in public places because of race?