if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

In the figure shown, cos P = 0.60. What is the length of PN
define phanerograms with examples.​
The average distance between the planet Neptune and the sun is about 4 x 10^9 kilometers. What is 4 x 10^9 written in standard notation? A. 0.0000000004 B. 0.00
1875/10000 as a simplified mixed number
Find the equation of the line passing through the point (-6,4) that is perpendicular to the line 5x+3y=5
What are the places human can migrate in near future
Jeff and Eric roommates and enjoy talking about sports. They mainly discuss their favorite professional soccer teams. Jeff enjoys European soccer whereas Eric p
A triangle has side lengths of 9 centimeters and 15 centimeters. The third side has a length of x centimeters. complete the inequality to show all the possible
Use distributive property to rewrite 6m(3n+1) in its equivalent form
i don’t understand??