A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

P(-4, 6), Q(2, 5), R(3, -1), S(-3, 0) Use slope to determine whether the following is a parallelogram. Explain why or why not. Find the slope of PQ Find the slo
The product of 2 more than 3 times a number and 6 less than 4 times the number (z)
The driving distance between Manchester and London is 195 miles. Farid intends to travel from Manchester to London by coach. The coach will leave Manchester at
The length of an arc of a circle is 7.34 units, and the measure of the corresponding central angle is 81°. What is the approximate length of the radius of the c
Solve each inequality and graph the solution on a number line. a.) -12a +7 ≤31 b.) -9 > 3b +6
An organization supports 125 villages financially. This figure is only 11% as compared to the organization's worldwide support. How many villages does the organ
In not more than 350 words write an essay describing the sunday market in lagos​
please help PLEASE ​
how much is 10 cents +6 dimes + 5 cents equal? is it equal to a dollar?​
Summer driving side effects