razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

What is the hydronium and hydroxide concentrations of a solution that is 5.0 x 10-3 M H2SO4.
3) After measuring the heights of 7 people, they have an average height of 156cm. After measuring the heights of 8 people they have an average height of 158cm.
Transitional Expressions​
Please help I'll mark brainliest ​
PLS I need help with this
Write the quadratic equation whose roots are 1 and −5, and whose leading coefficient is 4.
solve this to get brainiest ​
A suit is on sale for 72% off. The sale price is $263.20. What is the regular price?
what is the range of the exponential function y=2^x plus 2? A. Y<0 B. Y<-1 C. Y<-2 D. Y<-1 (Less than or equal to)
The speed of the jet Alyssa flew on from Boston to London was 480 mph. on her return flight, the speed of the jet was 600mph with a tail wind. What was Alyssa's