argilagoso9 argilagoso9
  • 02-01-2022
  • Mathematics
contestada

If 7 men can do a job in 24 days and 3 men are fired from the job how long will the remaining men take

Respuesta :

mwall62
mwall62 mwall62
  • 02-01-2022

Answer:

36 Days to Do the job

Step-by-step explanation:

Answer Link

Otras preguntas

_________ are rocky materials mixed with very thick oil. A. Tar pits B. Conglomerates C. Oil shales D. Tar sands
Alice earned $622.50 in interest on her savings in the bank. Before interest, the account had $12,450. What is the approximate percent she earned in interest? A
The conservative movement that brought Reagan to power called for ______. MULTIPLE CHOICE government regulation of the economy the limited role of government in
A delivery man starts at the post office, drives 40 km north, then 20 km west, then 60 km northeast, and finally 50 km north to stop for lunch. use a graphical
Logistics means creating an efficient assembly line.
The principle of superposition states that in undisturbed rock layers, the youngest layer of rock will be on the bottom, while the oldest layer will be on the t
At what point in the reading process do you engage in prediction? A) Throughout B)At the beginning C) At the end D) In the middle
A positive attribute of a medical administrative assistant is the ability to
Match the description with the correct civilization. PLEASE HELP!! Los arcos son una gran parte de la arquitectura colonial. 2. La influencia del árabe es mu
What is a competency based interview?