In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

In dhcp, what address is reserved for use by clients that are not yet configured with an ip address?
which describes the role of marrow? A. produce blood cells and produce fat B. store blood cells and ossify bone C. ossify cartilages and store fat D. produce bl
A plane traveling at a constant speed is able to travel 600 miles in 5 hours. how fast was the plane flying?
of the following sets, which number in { 0,1,2,3,4} make the inequality 7 x + 3< 17 true
state two characteristics of a formal group
What equation would you use to calculate the ideal mechanical advantage of a wheel and axle if the input force is applied to the axle?
Who Explored the west coast of the Americas Prince Henry of portugal Sir Francis drake Henry Hudson De verrazzano
Which box plot represents the data? 30, 35, 25, 5, 5, 25, 40, 45, 50, 10, 15, 40
The chief importance of the Phoenician alphabet was that it allowed Phoenicians to represent letters using pictures. its letters could be turned on their sides.
) briefly explain the difference between oxidation and reduction electrochemical reactions