savalliejoycehtwi savalliejoycehtwi
  • 04-05-2017
  • Business
contestada

A _____ refers to a control system combining four sets of performance measures: financial, customer, business process, and learning and growth

Respuesta :

ChrissyR
ChrissyR ChrissyR
  • 04-05-2017
The answer is balanced scorecard
Answer Link

Otras preguntas

What value of z makes the equation true? Show your work. [tex] \frac{1}{6} = \frac{x-7}{12} [/tex]
If a fast-moving neutron were to hit an atomic nucleus and break it into smaller atomic nuclei, a ________ reaction would occur. a. fusion b. fission c. phys
What is the correct interpretation of the following lines from act IV, scene II, of Twelfth Night?
a piece of string is 112 inches long. Isabel wants to cut into two pieces so that one piece is as three times as long as the other. how long is each piece?
Which sentences in these excerpts reflect the common theme of soldiers’ reluctance to talk about their war experiences? Ambush by Tim O'Brien (excerpt) When s
what does prosperous mean
192 fluid oz equals how many pt
304/320 simplified, please help, the faster the better.
The poem: " To the doctor who treated the raped baby and who felt such despair". Q: in the first line, the speaker asserts that he or she is speaking "on behalf
Which of Mendel's laws or principles states that gametes carry one allele for each trait?